Interior Paint Complete
After the long process of watching paint dry, I was able to hang the lights, mini split and start installing hardware.
After the long process of watching paint dry, I was able to hang the lights, mini split and start installing hardware.
FREE DOWNLOAD: DEREK’S ADU PLANS
The Barn Cabin 1 Bdrm 1 Bath 528 sq ft
rthreev.org/2022/01/12/accessory-dwelling-unit
ADU is short for Accessory Dwelling Unit. It can be accessory to detached single-family homes, townhouses, manufactured homes and duplex dwellings on their own lot.
Jump to your town’s ADU rules: Medford – Phoenix – Talent – Ashland – Central Point – Jackson County
If you are a professional homebuilder, see this set of ideas.
Here’s Derek Sherrell, local ADU developer who offers a lot of great advice and encouragement to anyone interested in ADUs.
See more tips from Derek, That ADU Guy, on YouTube and on his website.
Here’s Carlos Delgado, the architect who designed the ADU plans pre approved in the city of Medford talking about his approach to ADUs.
Check with your local community development staff before you give up on the ADU idea. More info below
Here’s Kristen Maze, Director of Community Development at the City of Talent helping you think about preparing to apply for permits to build an ADU.
This process is NOT simple. We are trying to help you get started, but know that there are many options and potential roadblocks along the way. But, as Derek says, the hard work is definitely worth it!
Lots of good materials on these websites:
This is only a few key pieces of a much larger puzzle. Check with your local planning department, their contact information is at the top of this table. On your phone, click on the phone number to dial it.
Click to jump to your town: Medford – Phoenix – Talent – Central Point – Jackson County
Planning department contact information
ADUs are allowed in zones
R-1, R-1-3.5, RR, WR, R-2, R-3, NN, NM
Setbacks and coverage ratios
Set back and coverage ratios vary for different zones. Find the requirements for your zone here.
Other rules
Just a start here, look at more info links for the complete picture
Off-street parking is NOT required
Accessory Residential Units (ARU) and in the Single-Family Residential Zones (R-1-5/R-1-7.5 & R-1-10) ARUs require a Conditional Use Permit.
Link to building permits
Planning department contact information
stephanie.holtey@centralpointoregon.gov
ADUs are allowed in zones
R-L, R-1, R-2
LMR, MMR, HM
Setbacks and coverage ratios
Rear Yard Setback: 5 ft
800 sq ft or 50% of the gross floor area of the primary dwelling, whichever is less
Other rules
– just a start here, look at more info links for the complete picture
Off street parking is NOT required.
Separate utility connections are not required
Link to building permits
Planning department contact information
ADUs are allowed in zones
MFR-30, MFR-20, MFR-15, SFR-10, SFR-6, SFR-4, SFR-2
Setbacks and coverage ratios
Up to 75% of the primary dwelling’s Gross Habitable Floor Area (GHFA)
Detached ADUs cannot be larger than 900 sq. ft.; attached ADUs converted from existing space in the primary home cannot be larger than 50% of the primary dwelling
Other rules
– just a start here, look at more info links for the complete picture
Off street parking is NOT required
Link to building permits
Applying for a permit
ADU Fee Waiver
Planning department contact information
ADUs are allowed in zones
R-1
Setbacks and coverage ratios
Maximum lot coverage 40%
Minimum lot size 6,000sqft
Other rules
– just a start here, look at more info links for the complete picture
Off street parking is NOT required
Link to building permits
Building permit information here
Planning department contact information
ADUs are allowed in zones
RLD, RMD, RHD, RMH, CN
Setbacks and coverage ratios
Not to exceed 800 square feet of floor area, or 75 percent of the primary dwelling’s floor area, whichever is smaller.
Other rules
– just a start here, look at more info links for the complete picture
Off street parking is NOT required
More info here
Link to building permits
Planning department contact information
ADUs are allowed in zones
Unlikely outside the UGB, White City allows ADUs.
Rural areas are unlikely to allow ADUs. That is under review in the state wildfire risk map that is to be completed in Fall 2022.
Depends on your zoning because the County considers an ADU a separate dwelling on the lot.
Setbacks and coverage ratios
Depends on your zoning.
Other rules
Consult with planners at the County.
Link to building permits
Oregon Statue on Accessory Dwelling Units in Rural Residential Areas
ADUs are an important way to fill in the missing middle in our housing supply.
Professional home builders can make ADU development much easier by planning ahead. This video offers a few good ideas.
One creative idea for affordable homes with ADUs is for builders to build the ADU first and sell the large lot with its approved larger home site left for future development. This allows buyers to get started on homeownership more easily while they can look forward to building their larger home once they have built equity in their starter home.
There are many ways to finance an ADU project. Working with an experienced
lender to assess your financing options will help you to define the budget, timing
and scope of your ADU project.
Contact:
David Blackmon
Branch Manager NMLS 1017565
Lumen Mortgage
503-966-9255
dblackmon@lumenmortgage.com
“The Planning and Development Department’s recent ADU|HOU Design Competitionreceived enthusiastic response from architects and design professionals, and has garnered about 30 submissions of Accessory Dwelling Unit schematic designs and concepts. After receiving nearly 400 online votes, we have a winner.”
Congratulations to the Rice Architecture team.
“Double House,” submitted by two Rice Architecture students – Adam Berman and Siobhan Finlay – was the top design selected in a public online vote in early October. Read more
Transcript
Good day, ADU enthusiasts! Derek That ADU Guy here taking a minute to talk about zoning.
The very first step in the ADU process is calling your planning department and asking if you can build an accessory dwelling unit at your address.
Time and time again I see folks go out, they get a designer, they find a builder, they spend thousands of dollars to come up with an awesome plan just to go down and find out that there’s no allowable use in their zone. So the very first place that you need to be starting is with your community development department. A phone call, an email… you can do the homework yourself. You can go into the code and you can look at zoning maps, but it’s a lot easier if you just send an email or call.
This question comes up a lot: “what is the order of operations?”
A lot of people say well, budgeting is more important. You need to make sure that you can finance an ADU before you do any of the planning work, or before you do any of the zoning work. I disagree and I’ll tell you why.
If you have a spot in your town or county or municipality where you can build an accessory dwelling unit — it’s as an allowable use in your backyard — but you don’t have the financing there are avenues to find financing. Whereas, in the opposite argument, if somebody says you need to start with budget and you need to go through the whole process of getting pre-approved for the money, no matter what (even if you have money in-hand), if it’s not an allowable use in your zone, you’ve wasted your time.
So I always coach people with the simple starting process of going down to, or calling, or emailing your local planning office to ask directly if you can do an ADU in your front yard, backyard, side yard or incorporated as a part attached to your primary house.
Hope that helps. Again, the starting point is call your local planning and zoning office. Thanks for your time. Hope everybody’s having a good day!